10.4 Project plan and schedule

In the Project plan and schedule phase, the student prepares a schedule for the phases of the thesis and arranges the first guidance session with their principal thesis tutor. After this, you can accept the phase. This phase is not listed as a separate course in Peppi as it is part of the Bachelor’s and Master’s Thesis Planning course.

The schedule prepared by the student is displayed at the top of the thesis tutor view, in the project section (Figure 1). The orange full colour shows all the steps that have been accepted. The open orange icon indicates the step where the project is going on and the grey icons are the steps to come.

Figure 1. Project schedule in the thesis tutor’s view